top of page

How Long Does It Really Take to Fully Renovate a House?

Updated: Aug 4, 2023

Embarking on a full home renovation is an exciting yet complex undertaking. One of the most common questions homeowners have is how long the process takes. While each project is unique, this blog post aims to provide a general timeline for key renovation phases, including new bathroom installations, new kitchen projects, loft conversions, and house extensions.


But, Keep in mind that actual timelines may vary based on the size of your home, the complexity of the renovations, and unforeseen circumstances.


kitchen newly renovated
Kitchen renovation

Phase 1: Planning and Design (2-6 months)


Before any physical work begins, careful planning and design are crucial. This phase includes:

  1. Creating a Renovation Plan: Allocate 2-4 weeks to work with architects, designers, and contractors to develop a comprehensive renovation plan that includes your vision, budget, and desired outcomes.

  2. Obtaining Permits and Approvals: Depending on local regulations, acquiring planning permissions and building permits can take 4-12 weeks. This is an essential step to ensure compliance with building codes and regulations.


Phase 2: Preparing the Site (2-4 weeks)


  1. Demolition and Site Clearance: The duration depends on the scale of the demolition required. Removing existing fixtures, walls, or structures can take 1-3 weeks, including waste removal.

  2. Structural Assessment: If significant structural changes are planned, a structural engineer will assess the site to ensure the integrity of the building and provide recommendations for support.


Remember, every custom home renovation is a one-of-a-kind project with its own challenges and variables. That means every home remodel has its own unique schedule.

Phase 3: Core Renovation Work (3-8 months)


  1. New Bathroom Installation: The timeframe for a new bathroom installation can vary from 2-4 weeks, depending on the complexity, plumbing changes, and customization requirements.

  2. New Kitchen Renovation: Renovating a kitchen typically takes 4-8 weeks, considering the installation of new cabinets, countertops, appliances, electrical work, and plumbing adjustments.

  3. Loft Conversion: A loft conversion can take 6-12 weeks, depending on the complexity and size. This includes insulation, flooring, installation of stairs, windows, and electrical work.

  4. House Extension: The duration of an extension project varies significantly based on the size and complexity. Single-story extensions may take 3-6 months, while double-story extensions can extend the timeline to 6-12 months.


newly renovated bathroom
bathroom renovation

Phase 4: Finishing Touches (2-8 weeks)


This phase involves finalizing details and adding the finishing touches:

  1. Painting and Decorating: Painting the walls, applying finishes, and installing flooring can take 1-4 weeks, depending on the size of the area.

  2. Fixture and Fittings Installation: Installing fixtures, lighting, and fittings in the newly renovated spaces generally takes 1-4 weeks.


Phase 5: Final Inspections and Clean-up (1-2 weeks)


Before moving back into your renovated home, it's essential to conduct final inspections and ensure everything is in order. This includes cleaning up the construction debris and making any necessary touch-ups.


newly renovated and decorated hallway
Hallway renovation and decor

Conclusion:


While a full home renovation timeline can be influenced by various factors, understanding the general phases and their associated timeframes can help you plan and manage your project effectively.


Remember, communication with your renovation contractors, architects, and designers is key to staying on schedule. By considering the timelines for new bathrooms, kitchens, loft conversions, and extensions outlined in this article, you'll have a better understanding of what to expect during your home renovation journey.

Comments


bottom of page